Skip to main content
RACELOGIC Support Centre

Survey Trolley

The VBOX Survey Trolley is made to give you the ability to map the curved lane edges of a test track to a high accuracy.

You can use the logged file as a reference lane when you are doing tests with a VBOX 3i. You can do this live during testing or in post-processing with the post-processing software, Lane Departure.

The survey trolley comes with a line-mapping rover wheel, a custom rucksack, a radio antenna and a battery pack. 

It is available in 4 RF antenna options:

  • 2.4 GHz
  • 868 MHz
  • 915 MHz
  • 400 to 470 MHz 
Survey Trolley 1.png

To get the full functionality, you will also need the following hardware:

  • ACS067 antenna
  • RLVB3iR10G10/RLVB3iSL-RTK
  • RLVBBS4RG, Base Station
  • DGPS telemetry Radio
 

Using the Survey Trolley

Assemble the Survey Trolley

  1. Remove the small nut and washer from the male connector on the SMA cable (A8).
  2. Insert the male connector of the SMA cable through the small hole on the telemetry antenna bracket (A10).
  3. Attach the washer and nut on the Male connector to fasten it to the antenna bracket and tighten it with an 8-mm spanner.
  4. Attach the telemetry antenna (A9) to the male SMA cable connector (A8).
  5. Remove the telescopic pole from the surveying rucksack (A2).
  6. Remove the plastic cover from the end of the pole.
  7. Secure the antenna bracket (A10) on the telescopic pole with the stainless steel nut provided.
  8. Attach the telescopic pole to the surveying rucksack.
  9. Route the SMA cable (A8) through the bag’s interior.
  10. Attach the female connector on the SMA cable (A8) to the VBOX Telemetry Module (G).
  11. Place the stainless-steel offset bracket (A4) on top of the rover wheels (A6) facing towards the direction of travel.
  12. Secure with the stainless-steel nut provided.
  13. Fix the telescopic handle (A7) to the rover wheels (A6) with the washers and bolt provided. Note: Make sure that the washers are fitted to either side of the telescopic handle before you secure the bolt. Do not over-tighten.
  14. Screw the GPS ground plane antenna (B) to the protruding bolt at the top of the offset bracket. Note: Make sure that the ground plane antenna’s connector is in line with the telescopic handle.
Assembly instructions - parts overview-no VBOX Manager.png

Connect

  1. Connect one end of a 5-pin LEMO cable (RLCAB005) to the port on the VBOX Telemetry Radio (G).
  2. Connect the other end of the cable to the SER port on VBOX 3i ADAS (F).
  3. Connect the Li-ion battery pack (A3) to the PWR port on the VBOX 3i ADAS (F).
  4. Connect the TNC connector on the TNC-to-SMA cable (A1) to the connector on the GPS ground plane antenna (B).
  5. Connect the SMA connector to the primary antenna connector (A) on the VBOX 3i ADAS.
  6. Connect the other end to the RL CAN port on the VBOX 3i ADAS (F).
  7. Make sure that you secure all connected units in the surveying rucksack (A2) and that you tie the antenna cables to the telescopic pole with the supplied velcro wraps.
Survey Trolley In Use .png Survey Trolley In Use 2.png


 

  • Was this article helpful?